![]() | HSE DEPARTMENT CONTROLLED DOCUMENT QSHE Management System Manual Job Safety Analysis and Project Planning Document | Document Number: QHSE-TSI-CF-8.0 Revision Number:7 Date: 6/15/2025 Approver: Jeremy Melder |
| STEP SEQUENCE OF JOB PROCEDURES | POTENTIAL HAZARDS (SPECIFIC) | ACTIONS TO REDUCE/ELIMINATE HAZARDS |
| ● HANDLNG PLUG, TOOL GUIDE, AND LIFT PLUG INSTALLATION | ● IMPROPER INSTALLATION OF THE TOOL GUIDE OR LIFT PLUG COULD RESULT IN THE DROPPING OF A JOINT CAUSING DAMAGES TO EQUIPMENT, INJURIES, OR EVEN DEATH | ● READ ALL THE PROCEDURES OF THE REQUIREMENTS OF HTE INSTALLATION OF HANDLING DEVICE ● GET PROPER INSTRUCTIONS AND TRAINING BEFORE PERFORMING TASK ON YOUR OWN ● IT IS IMPERATIVE THAT OEM/API PROCEDURES FOR INSTALLATION OF HANDKLING DEVICE IS FOLLOWED TO THE LETTER. FAILURE TO ADHERE DAN RESULT IN POTENTIAL PERSONNEL INJURY, DEATH AND/OR DAMAGES TO JOINTS/EQUIPMENT |
| ● REMOVAL OF PIN PROTECTORS AND CLEANING OF PIN THREADS | ● USING A HAMMER TO REMOVE STUCK PROTECTORS COULD RESULT IN INJURIES ● THE DEGREASER TO CLEAN THE THREADS CAN GET INTO YOUR ETES IF NOT WEARING PROPER PROTECTION | ● GIVE PROPER INSTRUCTIONS OF THE INSTALLATION OF PROTECTORS TO PREVENT THEM FROM GETTING STUCK ● IF STUCK ON CASING, USE CHAIN TONGS TO REMOVE PROTECTORS ● WHEN USING CHEMICALS TO CLEAN THEADS WEAR GLOVES AND SAFETY GLASSES TO PROTECT YOU |
| ● PERFORM THREE DUMP TESTS/DEAD STICKS | ● DURING THE DUMP TEST A JOINT COULD BE KICKED OVER INTO THE BOARD ● IF THE TONGS ARE NOT LEVEL OR THE SNUB LINE NOT AT 90° THEN IMPROPER TORQUE READINGS ARE POSSIBLE | ● WHILE DUMP TESTS ARE BEING PERFORMED WATCH THE EQUIPMENT AND JOINT TO MAKE SURE DAMAGES ARE NOT INCURRED ● CONFIRM TONGS ARE LEVEL AND SNUB LINE IS AT THE REQUIRED ANGLE TO GET ACCURATE TORQUE READINGS |
| ● RUN 15-20 JOINTS AND EVALUATE | ● PAUSE TO REVIEW THE RUNNING OF THE CONNECTION AND MAKE ADJUSTMENTS THAT NEED TO BE DONE TO THE EQUIPMENT OR PROCEDURES TO ENSURE A SAFE SMOOTH JOB | |
| ● MAKE UP CONNECTIONS TO PROPER TORQUE | ● MAKING UP CONNECTIONS WITHOUT VERIFICATION OF THE CASING STENCILS COMPARED TO CONNECTION DATASHEETSJ WILL RESULT IN RUNNING IMPROPERLY AND COULD RESULT IN A CASING FAILURE | ● ALWAYS VERIFY THE PIPE STENCILS AND COMPARE TO YOUR CONNECTION DATASHEETS TO MAKE UP CONNECTION TO THE CORRECT TORQUE ● REVIEW THE RUNNING PROCEDURES TO ENSURE PROPER HANDLING AND CARE IS TAKEN ● VISUALLY VERIFY PROPER MAKEUP WHEN CASING HAS INDICATION MARKING LIKE A TRIANGLE STAMP |
| ● TORQUE TURN EQUIPMENT CABLES | ● UNSECURE CABLES COULD BE A DISTRACTION IF HANGING IN THE WAY OF THE TONG OPERATORS OR BECOME A TRIP HAZARD | ● MAKE SURE TO SECURE ALL CABLES THAT ARE ON THE TONGS AND ALSO GOING TO THE TORQUE MONITORING COMPUTER ● PERIODICALLY CHECK THE EQUIPMENT IS SECURE AND MAKE ADJUSTMENTS IF NECESSARY ● KEEP AREA CLEAN AND CABLES WRAPPED SO YOU ARE NOT CREATING TRIP HAZARDS |
| ● CHANGING OUT EQUIPMENT | ● NOT VERIFIYING OR MONITORING EQUIPMENT THAT IS CHANGED OUT COULD RESULT IN IMPROPER EQUIPMENT USED CAUSING DAMAGES OR INJURIES | ● WHILE EQUIPMENT IS BEING CHANGEDJ OUT, MONITOR THE WORKING CREW TO ENSURE PROPER EQUIPMENT IS GOING TO BE UTILIZED. ● IF UNABLE TO MONITOR THE WORKING CREW, THEN BEFORE OPERATIONS ARE TO BEGIN AGAIN VERIFY NEW EQUIPMENT IS ACCEPTABLE TO USE AND IN GOOD WORKING CONDITION |
| ● COMMUNICATE THE RUNNING OF ACCESSORIES AND THE MARKING OF CENTRALIZERS | ● NOT COMMUNICATING WITH ALL PERSONNEL DURING THE CASING RUN OR BEFORE ACCESSORIES ARE TO BE MADE UP COULD LEAD TO THEIR MISPLACEMENT IN THE STRING | ● IN THE PREJOB MEETING COVER THE PLACEMENT OF ALL ACCESSORIES GOING INTO THE STRING ● COMMUNICATE 10 JOINTS BEFORE RUNNING AN ACCESSORY OR SPECIAL ITEM SO EVERYONE IS AWARE AND CAN PREPARE FOR THE UPCOMING TASK |
| Safety First - Safety Always Plan and Execute for Success | Page: 3 of 8 |