When we work extra days on our days off, we get a bonus. Here's what the time sheet for that looks like.
Intrepid is the cheapest pipe there is, but here is the correct connection data sheet.
Duoline liners require information for the FSR that is found in this table.
Every once in a while, we run pipe without a torque turn, using the rig's hydraulic pressure gauge to limit torque. Here is the graph we need for that: